Enecor S.A.

The contract concerned the construction, operation and maintenance of the 500/132/33 kV Paso de la Patria Substation, its connection to the Rincón Santa María-Resistencia high-voltage line, extension of the Santa Catalina Substation, the 2 x 132 kV Paso de la Patria-Santa Catalina high-voltage line (21 km) and the telecommunications system. It also involved assignment of the technical license for electric power transportation as an independent service provider.